...
首页> 外文期刊>Model Engineer >PART 4: Building Bridget
【24h】

PART 4: Building Bridget

机译:第4部分:建筑布里奇特

获取原文
获取原文并翻译 | 示例
           

摘要

The smokebox With Bridget both the steam supply and (obviously) the steam exhaust pass through the smokebox so it is necessary to get the smokebox in the right position before the appropriate steam plumbing can be put in place. The steam supply will come from the superheater tubes into the steam column, a vertical gunmetal manifold that passes through the bottom on the smokebox and then out to the cylinder steam chests. The lubricator injects steam oil into the very bottom of this column so that it is carried into the cylinders. This is a reasonably straightforward machining job with some copper pipe work. The supply pipes have to bend through a pretty sharp right angle as they go over the frames and on to the top of the cylinder. I found this pretty hard to do well and, in the end, made a deep groove in a piece of round bar and worked it round as best I could with lots of annealing.
机译:烟盒具有蒸汽供应和(显然)蒸汽排气穿过烟盒,因此必须在适当的蒸汽管道安装到正确位置之前获得烟盒。 蒸汽供应将来自过热器管进入蒸汽柱,垂直铜歧管穿过烟盒上的底部,然后转到气缸蒸汽箱。 润滑剂将蒸汽油注入到该柱的非常底部,使其进入汽缸。 这是一个具有一些铜管的合理直接加工工作。 当它们越过框架并达到气缸顶部时,供应管必须弯曲相当尖锐的直角。 我发现这很难做得很好,最后,在一条圆形的酒吧里制作了一个深沟,并尽我所能用很多退火圈完成它。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号