Finding the optimal design and delivery solution for a large thickener at a remote gold mine in the West African state of Mauritania meant considering a complex range of technical, transportation, and assembly options. According to Ricus van Reenen, senior account manager at FLSmidth, the cost of transporting all the components for the 50m-diameter thickener was a key factor affecting the design. He highlights that transportation of components to remote sites can comprise a substantial portion of costs, and that break-bulk shipping costs are significantly higher than containerised transport.
展开▼
机译:在毛里塔尼亚西非莫里塔尼亚西非的遥远金矿中寻找最佳设计和交付解决方案,意味着考虑到复杂的技术,运输和装配选项。 根据Ricus Van Reenen,Flsmidth的高级客户经理,运输50米直径增稠剂的所有部件的成本是影响设计的关键因素。 他突出显示,远程站点的组件运输可以包括大量成本,并且突破散装运输成本明显高于集装箱运输。
展开▼