首页> 外文期刊>Mineral Planning >Rail link project causes mineral extraction proposal to be brought forward
【24h】

Rail link project causes mineral extraction proposal to be brought forward

机译:轨道链接项目导致矿产提取提案提出前进

获取原文
获取原文并翻译 | 示例
           

摘要

Buckinghamshire County Council has approved a proposal to extract two million tonnes of sand and gravel from a site near Slough, subject to there being no conflict with the proposed western rail link to Heathrow airport (WRLH). The 36-hectare site had no history of mineral extraction and comprised agricultural land, including "best and most versatile" grades. Cemex had put forward the site to be allocated in the emerging development plan which was scheduled for adoption in spring 2019.
机译:白金汉郡县议会已批准从斯劳附近的网站中提取200万吨沙子和砾石的提议,这是不与拟议的西轨连接到希思罗机场(WRLH)的冲突。 36公顷的网站没有矿物提取史,包括农业用地,包括“最多和最通用”等级。 CEMEX提出了在2019年春季通过的新兴发展计划中分配了该网站。

著录项

  • 来源
    《Mineral Planning》 |2017年第172期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号