首页> 外文期刊>Mineral Law Newsletter >California - Oil & Gas
【24h】

California - Oil & Gas

机译:加利福尼亚 - 石油和天然气

获取原文
获取原文并翻译 | 示例
           

摘要

In Vaquero Energy, Inc. v. County of Kern, 255 Cal. Rptr. 3d 221 (Ct. App. 2019), two operators challenged Kern County's permitting process for oil and gas exploration, drilling, and production on split-estate land (i.e., where different owners hold the surface rights and the mineral rights). On certain split-estate lands, the County can issue a permit through a seven-day process if the operator obtains the surface owner's approval of a site plan showing the location of proposed wells, roads, pipelines, and other infrastructure. Id. at 226. If the operator cannot obtain the surface owner's approval of the site plan, then the County issues the permit through a 120-day process. Id. If the County issues the permit without the surface owner's approval, then the County also requires the operator to pay for on-site monitoring for compliance with the site plan. Id. at 227. A permit issued under the seven-day process does not require on-site monitoring because the surface owner has approved the site plan. Id.
机译:在Vaquero Energy,Inc.V.凯恩县,255克。 RPTR。 3D 221(CT.应用程序。2019),两名运营商挑战了Kern County允许石油和天然气勘探,钻井和生产过程中的石油和天然气勘探(即,不同的所有者持有方面权和矿产权)。在某些分裂地产土地上,如果运营商获得了展示井,道路,管道和其他基础设施的地点的场地计划的批准,该县可以通过七天的进程发出许可证。 ID。在226.如果运营商无法获得地表所有者对网站计划的批准,那么该县通过120天的流程发出许可证。 ID。如果该县在没有表面所有者批准的情况下发出许可证,那么该县还要求运营商支付现场监测以遵守网站计划。 ID。在227.根据七天进程发布的许可证不需要现场监测,因为表面所有者已批准该网站计划。 ID。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号