Asphalt tiles were torn off and replace with metal tiles on St. John's Lutheran Church in Ocono-mowoc. Wis. The asphalt shingles lasted 25 to 30 years and the building was constructed in 1956. The church is located in an area that experiences high winds, and the owners sought a replacement roof that would last longer than the asphalt shingles.
展开▼