首页> 外文期刊>Foster Natural Gas Report >FERC Issues Notice of EA for Port Arthur Pipeline’s Louisiana Connector Amendment, Comments Due by March 6
【24h】

FERC Issues Notice of EA for Port Arthur Pipeline’s Louisiana Connector Amendment, Comments Due by March 6

机译:FERC发布EA通知arthur管道的路易斯安那州的路易斯安那州的路易斯安那州连接体修正案,截至3月6日至3月6日期间

获取原文
获取原文并翻译 | 示例
           

摘要

The Commission issued a notice February 5, that its staff will prepare an environmental assessment (EA) that will discuss the environmental impacts of Port Arthur Pipeline, LLC’s (CP20-21) Louisiana Connector Amendment Project involving construction and operation of facilities in Beauregard Parish, Louisiana. Comments are due to the Commission on or before March 6. The amendment is for the Louisiana Connector Project to relocate the site of the compressor station approved as part of the project and add and relocate several pipeline interconnections and associated facilities.
机译:委员会于2月5日发布通知,其工作人员将编制一个环境评估(EA),将讨论亚瑟管道,LLC(CP20-21)Louisiana连接器修正项目的环境影响,涉及Beauregard教区的设施建设和运营, 路易斯安那州。 评论是由于委员会在3月6日之前或之前委托。修正案适用于Louisiana连接器项目,以重新定位作为项目一部分的压缩机站的网站,并添加和重新定位几个管道互连和相关设施。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号