...
首页> 外文期刊>Foster Natural Gas Report >AltaGas Begins Operations at North Pine NGL Separation Facility
【24h】

AltaGas Begins Operations at North Pine NGL Separation Facility

机译:Altagas开始在北松NGL分离设施的运营

获取原文
获取原文并翻译 | 示例
           

摘要

AltaGas Ltd. on December 20, said it started operations at its North Pine NGL Separation Facility in British Columbia, with the $120 million (Canadian) project completed ahead of schedule and about (C)$15 million under budget. The North Pine facility is connected to existing AltaGas infrastructure and has access to the Canadian National Railway network, allowing transportation of propane, butane, and condensate to different markets, including the Ridley Island Propane Export Terminal (RIPET) that is under construction in British Columbia and due to be completed in early 2019. “Once RIPET is complete, we will be able to offer producers a broad suite of midstream services and new market diversification, including premium netbacks through the strong propane demand and pricing in Asian markets,” said David Harris, president and CEO of AltaGas.
机译:Altagas Ltd. 12月20日表示,它在不列颠哥伦比亚省的北松NGL分离设施开始运营,超过1.2亿美元(加拿大)项目提前完成,预算下的1500万美元。 北松设施与现有的Altagas基础设施有关,可以进入加拿大国家铁路网络,允许在不列颠哥伦比亚省正在建设的罗德利岛丙烷出口终端(推销)的不同市场运输丙烷,丁烷和凝结物。 并由于2019年初完成。“一旦推卸完成,我们将能够为生产商提供广泛的中游服务和新的市场多样化,包括通过亚洲市场的强大丙烷需求和定价的高级网路,”大卫说 哈里斯,阿尔塔斯总统兼首席执行官。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号