首页> 外文期刊>Foster Natural Gas Report >Natural Gas Suppliers Support PJM Performance Proposal at FERC as Positive Step to Help Reliability of Gas-Fired Generators
【24h】

Natural Gas Suppliers Support PJM Performance Proposal at FERC as Positive Step to Help Reliability of Gas-Fired Generators

机译:天然气供应商支持FERC的PJM绩效提案,以帮助燃气发电机的可靠性

获取原文
获取原文并翻译 | 示例
           

摘要

In comments filed this week, the Natural Gas Supply Association (NGSA) urged FERC to approve a proposal from PJM Interconnection, LLC (ER15-623) to modify the organized electricity market’s capacity market design in order to promote greater fuel reliability. That concept, designated as a Capacity Resource Performance provision, is prescribed by PJM to provide energy and reserves when called upon during emergencies. The Capacity Resource Performance provision will, according to NGSA, hold all types of generation to the same standard of performance and will be subject to the same rate, with very limited excuses. Compensation would not be dependent on which technology or fuel source is used; it would depend solely on whether the generator is capable of meeting its performance obligation. NGSA believes such a fuel-neutral mechanism is beneficial because, if resources are treated differently the fundamental market-based concept would be compromised and could hamper the price signals needed to achieve the intended market behaviors.
机译:在本周提交的评论中,天然气供应协会(NGSA)敦促FERC批准PJM互连,LLC(ER15-623)的提案,以改变有组织的电力市场的能力市场设计,以促进更大的燃油可靠性。该概念被指定为能力资源绩效规定,由PJM规定,在紧急情况下调用时提供能量和储备。根据NGSA的说法,容量资源绩效提供的条件将使所有类型的生成持有相同的性能标准,并将受到相同的速率,借口非常有限。赔偿不依赖于使用哪种技术或燃料源;它只取决于发电机是否能够满足其性能义务。 NGSA认为这种燃料中立机制是有益的,因为如果资源得到不同的方式,基于基于基于市场的概念会受到损害,并且可能会妨碍实现预期市场行为所需的价格信号。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号