...
首页> 外文期刊>Foster Natural Gas Report >Fight on Enbridge Line 3 Project Returns to Minnesota PUC After Court Ruling
【24h】

Fight on Enbridge Line 3 Project Returns to Minnesota PUC After Court Ruling

机译:在法庭裁决后,在枚恩桥第3行投资回报到明尼苏达州PUC

获取原文
获取原文并翻译 | 示例
           

摘要

The challenges for Enbridge’s Line 3 oil pipeline replacement project will move back to the Minnesota Public Utilities Commission (PUC) now that the state Supreme Court declined to take up challenges to the environmental review of the project. Enbridge and the American Petroleum Institute (API) issued statements that they are pleased with the Minnesota Supreme Court’s September 17 ruling. The brief decision declined to review the opinion of the Minnesota Court of Appeals, which in June sent the case back to the PUC because a final environmental impact statement (EIS) failed to address the potential impact of an oil spill in the Lake Superior watershed.
机译:Enbridge第3行石油管道更换项目的挑战将返回明尼苏达州的公用事业委员会(PUC),据国家最高法院拒绝对该项目环境审查带来挑战。 Enbridge和美国石油研究所(API)发表了他们对明尼苏达最高法院的9月17日裁决感到高兴的陈述。 这项简短的决定拒绝审查明尼苏达院呼吁的意见,其中6月份将案件寄回PUC,因为最终的环境影响声明(EIS)未能解决石油泄漏在卓越的流域中的潜在影响。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号