首页> 外文期刊>Flow Measurement and Instrumentation >Construction of the new gas meter high pressure calibration facility - Technical and metrological problems
【24h】

Construction of the new gas meter high pressure calibration facility - Technical and metrological problems

机译:新煤气表高压校准设施的构建 - 技术和计量问题

获取原文
获取原文并翻译 | 示例
           

摘要

The necessity of the gas flowmeters calibration with the use of gas at expected working pressure is now beyond dispute. Most of gas meters types show the sensitivity to the parameters of the measured gas. The calibration factor, usually expressed as number of pulses per unit of volume, shifts when there is a change of an operating pressure. Change of operating pressure causes shift of calibration curve - so gas meters should be calibrated as close to operating conditions as possible. Polish Gas Transmission System Operator GAZ-SYSTEM SA decided to build the High Pressure Gas Meters Calibration Facility (HPCF) where natural gas is used as a working medium. The paper presents measures taken to overcome technical and metrological problems encountered during design and construction of the facility.
机译:在预期的工作压力下使用气体校准的气体流量计校准的必要性现在超出了争议。 大多数煤气表类型都显示了对测量气体参数的敏感性。 校准因子,通常表示为每单位体积脉冲数,当发生操作压力时换档。 操作压力的变化会导致校准曲线的偏移 - 因此应尽可能靠近操作条件校准煤气表。 波兰气体传动系统操作员GAZ-System SA决定构建高压气体计量设施(HPCF),其中天然气用作工作介质。 本文提出了在设施设计和建设期间遇到遇到的技术和计量问题所采取的措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号