...
【24h】

Deployment of Subsea Cable DARE1 Officially Completed

机译:Subsea Cable Dare1的部署正式完成

获取原文
获取原文并翻译 | 示例
           

摘要

Kenya is now officially connected to Djibouti via an optical fiber with the subsea cable Djibouti Africa Regional Express 1 (Dare1) landing on the Kenyan coast of Mombasa as expected. In May last year, the Kenyan government expressed its desire to connect to Dare1 for an investment of $59 million. With the more than 5,000 km-long cable completed, Kenya is expected to test the telecom infrastructure in the coming days before it goes live. Dare1, with a capacity of 36 terabits, is the fifth submarine optical fiber cable to which Kenya will be connected.
机译:肯尼亚现在正式通过光纤与吉布提与海底电缆吉布提非洲地区快递1(Dare1)登陆蒙巴萨的肯尼亚海岸预期。 去年5月,肯尼亚政府表示愿望与5900万美元的投资联系起来。 随着5,000多公里长的电缆完成,肯尼亚预计将在未来几天内测试电信基础设施。 Dare1,容量为36次,是肯尼亚将连接的第五潜艇光纤电缆。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号