...
首页> 外文期刊>Cranes today: The Global Magazine of the Crane Industry >Derrick does the job: Using a derrick to take down a Liebherr tower crane avoided the need for Sellen Construction to close busy Seattle streets
【24h】

Derrick does the job: Using a derrick to take down a Liebherr tower crane avoided the need for Sellen Construction to close busy Seattle streets

机译:德里克(Derrick)做到了:使用井架吊下利勃海尔(Liebherr)塔式起重机,无需塞伦建筑公司(Sellen Construction)即可关闭西雅图繁忙的街道

获取原文
获取原文并翻译 | 示例

摘要

After constructing the 36-storey 1918 Eighth Avenue office tower in downtown Seattle, Washington, commercial general contractor Sellen Construction needed to take down a Liebherr 355 HC-L. Because of the tower crane's close proximity to the building, it couldn't lower itself down. The company hired a Liebherr 200 DR 5/10 to dismantle the crane and finish work on the roof. While deciding to use the derrick, Sellen also looked into erecting a large mobile crane to take down the 355 HC-L.
机译:在华盛顿州西雅图市中心建造了36层高的1918第八大道办公大楼后,商业总承包商塞伦建筑公司需要拆除利勃海尔355 HC-L。由于塔式起重机非常靠近建筑物,因此无法将其降低。该公司雇用了利勃海尔200 DR 5/10来拆卸起重机并完成屋顶工作。在决定使用井架时,塞伦还考虑安装大型移动式起重机以拆除355 HC-L。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号