【24h】

UNDER THE BRIDGE

机译:在桥下

获取原文
获取原文并翻译 | 示例
           

摘要

In 2015,Transport Scotland notified SGN that it proposed to undertake a full refurbishment of the Erskine suspension bridge which crosses the River Clyde to the west of Glasgow.This bridge is a multi-span,cable-stayed box girder bridge spanning the river.It is over 1,300m in length and the deck is 45m above the river,with the pylons a further 38m above the deck.The main span of the bridge is 305m wide and connects the communities of West Dunbartonshire and Renfrewshire.As well as crossing the Clyde,the bridge also crosses the Forth and Clyde Canal and the North Clyde railway line.A local commuter railway station is situated beneath the bridge at the north side.
机译:2015年,运输苏格兰通知SGN,它建议完全翻新Erskine悬架桥,将克莱德在格拉斯哥西部交叉。这座桥是一座多跨度,缆车队长桥梁。它 长度超过1,300米,甲板上方45米,塔架在甲板上方另外3800万。桥梁的主要跨度宽305米,并将西邓公园郡和雷德沃尔郡的社区连接起来 ,这座桥还穿过第四座和克莱德运河和北克莱德铁路线。当地通勤火车站位于北侧的桥下。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号