...
【24h】

Loop Track COMEBACK

机译:循环轨道卷土重来

获取原文
获取原文并翻译 | 示例
           

摘要

Glacial Lakes Energy LLC in Watertown, South Dakota, added a four-track rail loop earlier this year, allowing the switch from manifest shipments to unit trains. The loop can accommodate four full unit trains and, in partnership with a new double loadout station and additional storage, the upgrades are enabling massive efficiency gains at the 60 MMgy plant. "This now allows us to ship all of our ethanol and DDGS by unit train, gaining more lucrative access to export markets and other markets only accepting products supplied by unit train deliveries," says Pat Ho-gan, Glacial Lakes Energy's director of operations. "Before we did the rail, we had a small ladder track system, a single loadout and we shipped all of our ethanol rail cars as manifest shipments, which means they went out in blocks of five, 10, 20 cars at a time."
机译:冰川湖Energy LLC在南达科他州的Watertown,今年早些时候增加了四轨道循环,允许从清单发货到单位列车。 该循环可以容纳四个完整的单位列车,并与新的双重装载站合作,升级在60 MMGY工厂中可以实现大量效率。 “这允许我们通过单位列车运送所有乙醇和DDG,获得更多利润丰厚地访问出口市场和其他市场,只接受单位列车交付所提供的产品,”冰川湖能源的业务总监Pat Ho-GaN说。 “在我们做铁路之前,我们有一个小梯形轨道系统,单一的装载机,我们将所有的乙醇铁路汽车作为清单出货量发货,这意味着他们一次在五个,10,20辆汽车的街区出去。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号