...
首页> 外文期刊>Engineering failure analysis >Cause investigation of damages in existing building adjacent to foundation pit in construction
【24h】

Cause investigation of damages in existing building adjacent to foundation pit in construction

机译:施工基础坑附近现有建筑损害的调查

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper presents a case study of investigating damages in existing building adjacent to foundation pit in construction, in which the settlement influence of adjacent building induced by constructing foundation pit is demonstrated by means of field observation, numerical analysis and experimental investigation. This study focuses on the principal cause inducing these damages in the existing building. This work demonstrates that the stratum settlement of the existing building during excavating foundation pit are significantly influenced by not only construction task of excavating soils but also that of dewatering soil mass in constructing foundation pit, since the principal constitution of fine sand and medium sand in the sludge can be easily run off with stratum loss during the dewatering task, and the hydraulic connection between the inside and outside of the foundation pit thus can't cut off using underground continuous wall, which can probably produce structural damage of soil mass with stratum settlement.
机译:本文提出了一种案例研究,对施工基础坑附近的现有建筑损害的案例研究,其中通过现场观察,数值分析和实验研究证明了构建基坑诱导的相邻建筑的沉降影响。本研究重点介绍了在现有建筑中诱导这些损害的主要原因。这项工作表明,在挖掘基础坑期间现有建筑物的地层解决是由于挖掘土壤的建设任务,而且在构建地基坑中的脱水土壤群体的施工任务显着影响,因为细砂和中沙子的主要构成在脱水任务期间,污泥可以轻松地耗尽地层损耗,并且基坑内外的液压连接因此不能使用地下连续墙切断,这可能会产生与地层沉降的土壤质量的结构损坏。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号