The safe operation of its 11,000-plus kilometre network is the highest priority of this transmission owner and operator. With assets located in high fire danger areas, and sections of densely vegetated transmission line corridors at risk of bushfire, risk minimisation is an integral part of its asset management strategy.
展开▼