Shipowner and operator Oldendorff has signed an agreement to deliver 4mn t/yr of thermal coal between Indonesia and Vietnam from 2021. The coal will be shipped to the new Nghi Son 2 power station being built by a joint venture between Japan's Marubeni Corp and Korea Electric Power (Kepco). Oldendorff will cover ocean shipping, transhipment and final delivery to Nghi Son.
展开▼
机译:船东和运营商Oldendorff签署了一项协议,从2021年签署了印度尼西亚和越南之间的4Mn T / Yr的热煤。煤炭将运送到新的Nghi Son 2电站由日本Marubeni公司与韩国电气之间的合资建造建造 电源(Kepco)。 Oldendorff将覆盖海运,转运和最终交付到Nghi儿子。
展开▼