...
首页> 外文期刊>Energy Argus petroleum coke >Transportation issues slow Coal India’s offtake
【24h】

Transportation issues slow Coal India’s offtake

机译:交通问题缓慢煤炭印度的冒烟

获取原文
获取原文并翻译 | 示例
           

摘要

Year-on-year gains in state-operated mining firm Coal India’s (CIL) deliveries slowed last month as transportation bottlenecks hindered operations, even as production edged higher. CIL deliveries inched up by 330,000t year on year — the weakest gain since October 2016 — to 43.91mn t in September. But offtake slipped by 1.31mn t from August — the fourth consecutive month-on-month fall. Deliveries tend to be weaker in August-September, when monsoon rains can flood roads, hindering transportation routes.
机译:国家运营的采矿企业煤炭印度(CIL)交付的年度股份是上个月减速,因为运输瓶颈阻碍了运营,即使生产边缘更高。 CIL每年递送3.30亿吨 - 自2016年10月以来最弱的收益 - 9月至43.91Mn。 但从8月份的秋季连续第四个月下跌,投反对票下跌1.31亿吨。 当季风雨洪水道路,妨碍运输路线时,8月至9月,交付往往趋于较弱。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号