...
首页> 外文期刊>Earthquake and structures: An International journal of earthquake engineering & earthquake effects on structures >Probabilistic estimation of seismic economic losses of portal-like precast industrial buildings
【24h】

Probabilistic estimation of seismic economic losses of portal-like precast industrial buildings

机译:门壁样预制工业建筑地震经济损失的概率估计

获取原文
获取原文并翻译 | 示例

摘要

A simplified framework for the probabilistic estimation of economic losses induced by the structural vulnerability in single-story and single-bay precast industrial buildings is presented. The simplifications introduced in the framework are oriented to the definition of an expeditious procedure adoptable by government agencies and insurance companies for preliminary risk assessment. The economic losses are evaluated considering seismic hazard, structural response, damage resulting from the structural vulnerability and only structural-vulnerability-induced e]conomic losses, i.e., structural repair or reconstruction costs (stock and flow costs) and content losses induced by structural collapse. The uncertainties associated with each step are accounted for via Monte Carlo simulations. The estimation results in a probabilistic description of the seismic risk of portal-like industrial buildings, expressed in terms of economic losses for each occurrence (i.e., seismic event) that owners (i.e., insured) and stakeholders can use to make risk management decisions. The outcome may also be useful for the definition of the insurance premiums and the evaluation of the risks and costs for the owner corresponding to the insurance industrial costs. A prototype of a precast concrete industrial building located in Mirandola, Italy, hit by the 2012 Emilia earthquake, is used as an example of the application of the procedure.
机译:提出了一种简化的概率估计,概率估计由单层和单湾预制工业建筑中的结构脆弱性引起的经济损失。框架中介绍的简化旨在定义政府机构和保险公司初步风险评估所采用的迅速程序。考虑抗震危害,结构响应,结构脆弱性和结构脆弱性诱导的e]核心损失,即结构修复或重建成本(库存和流量成本)和结构崩溃引起的内容损失的经济损失评估。与每个步骤相关联的不确定性都会通过Monte Carlo模拟占据。估计结果导致门户网状工业建筑的地震风险的概率描述,以经济损失为所有者(即,被保险人)和利益攸关方可以用于制定风险管理决策的经济损失而表达。结果也可用于保险费的定义以及对与保险工业成本相对应的所有者的风险和费用的评估。位于意大利Mirandola的预制混凝土工业建筑的原型由2012年Emilia地震击中,用作该程序的应用示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号