首页> 外文期刊>E & P: A Hart Energy Publication >Dispute Flares over Flaring in the Permian
【24h】

Dispute Flares over Flaring in the Permian

机译:在二叠纪爆发的争议耀斑

获取原文
获取原文并翻译 | 示例
       

摘要

Regulators side with producers over midstream but voice concerns over waste. Rule §3.32 of the Texas Administrative Code prohibits flaring of associated gas from initial completion beyond 10 producing days. Exceptions were allowed if a permit application showing cause was approved by the Railroad Commission of Texas (RRC), the state regulator for the energy industry. RRC records show that 107 venting and flaring permits were approved statewide in fiscal year 2008. That number swelled to 5,488 in fiscal year 2018.
机译:监管机构与中游生产者的一侧,但声音涉及废物。 德克萨斯州行政守则的规则§3.32禁止在10天之后从初始完成时燃烧相关的气体。 如果德克萨斯州德克萨斯州铁路委员会(RRC)的批准批准,德克萨斯州德克萨斯州(RRC),能源行业国家监管机构批准了例外情况。 RRC记录显示,2008财年批准了107次通风和燃烧许可。该号码在2018财年膨胀至5,488财年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号