首页> 外文期刊>E & P: A Hart Energy Publication >Implementing a flexible MPD approach in Vaca Muerta
【24h】

Implementing a flexible MPD approach in Vaca Muerta

机译:在Vaca Muerta实现灵活的MPD方法

获取原文
获取原文并翻译 | 示例
       

摘要

As activity in the Vaca Muerta Basin continues, operators should consider MPD for all wells. The Vaca Muerta Basin is a prolific basin considered by many to be the next large shale play globally. As of 2018, the operators there collectively were producing about 160,000 boe/d, and activity is expected to continue, primarily in greenfield blocks with a focus on horizontal wells. Despite current instability in the country due to the political environment and soaring inflation, the Vaca Muerta Basin remains a promising development for both national and international oil companies alike.
机译:随着Vaca Muerta盆地的活动继续,运营商应考虑所有井的MPD。 Vaca Muerta Basin是一种多产的盆地,被许多人认为是全球下一个大型页岩。 截至2018年,统称的运营商正在生产约160,000个BOE / D,并且预计活动将继续持续,主要是在Greenfield块中,专注于水平井。 尽管该国目前由于政治环境和通货膨胀飙升,但Vaca Muerta Basin仍然是国家和国际石油公司的有希望的发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号