首页> 外文期刊>Irrigation and Drainage >Strengthening the capacity of irrigation schemes to cope with flood through improved maintenance: a collaborative approach to analySe the case of Chokwe, Mozambique
【24h】

Strengthening the capacity of irrigation schemes to cope with flood through improved maintenance: a collaborative approach to analySe the case of Chokwe, Mozambique

机译:通过改进的维护来加强灌溉计划应对洪水的能力:分析Chokwe,Mozame的案例的合作方法

获取原文
获取原文并翻译 | 示例
       

摘要

Large-scale irrigation schemes, which are often developed in flood plains, overvalue technical expertise and the control of natural hazards and are particularly vulnerable to flooding, but there has been limited study on the impact of floods on irrigation functioning. Using a transdisciplinary approach developed in the Chokwe Irrigation Scheme during the 2013 post-flood recovery period, we analysed the impact of flooding on the scheme with a focus on maintenance. We argue that the flood crisis provided windows of opportunity to reconsider maintenance procedures by rethinking the relations and responsibilities between actors in this large-scale irrigation scheme; but the robustness of the system can only be increased if the changes strengthen the collective action capacity. Copyright (c) 2018 John Wiley & Sons, Ltd.
机译:大型灌溉计划,通常在洪水平原中开发,超值技术专长和对自然灾害的控制,特别容易受到洪水,但对洪水对灌溉功能的影响有限研究。 在2013年洪水灌溉方案中使用的跨学科方法在洪水恢复期间,我们分析了洪水对方案的影响,重点是维护。 我们认为洪水危机为通过重新考虑了这种大规模灌溉计划中的演员之间的关系和责任来重新考虑维护程序的窗户; 但是,只有在改变增强集体动作容量时才能增加系统的稳健性。 版权所有(c)2018 John Wiley&Sons,Ltd。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号