首页> 外文期刊>Central European journal of operations research: CEJOR >A Dynamical Model of Water Recycling in a Mine-Processing Enterprise
【24h】

A Dynamical Model of Water Recycling in a Mine-Processing Enterprise

机译:矿山企业的水循环动力学模型

获取原文
获取原文并翻译 | 示例
           

摘要

We consider a mine-processing enterprise, which runs a number of production plants. Each plant uses a considerable amount of water which is polluted during the production process. The aim is to determine the optimal amounts of water to be taken from a river or to be pumped back from a waste water reservoir. The problem is decomposed in two tasks. Task 1 is formulated as a time-discrete optimal control model and determines the amounts of water pumped in each period. The solution method used is dynamic programming. While Task 1 has an ecological objective (minimize environmental damage), in Task 2 the aim is to determine, by which pump configurations the desired quantities of water are most efficiently brought to reservoir (with least cost). Because of the special structure of this linear programming problem it can be solved simply by sorting with respect to unit costs.
机译:我们考虑一家经营许多生产工厂的矿山加工企业。每个工厂都使用大量的水,这些水在生产过程中会受到污染。目的是确定从河流取水或从废水水库抽回的最佳水量。该问题分解为两个任务。任务1被公式化为时间离散的最优控制模型,并确定每个时期的抽水量。使用的解决方法是动态编程。尽管任务1具有生态目标(最小化环境破坏),但任务2的目的是确定通过哪种泵配置,最有效地将所需的水量带到水库中(成本最低)。由于此线性规划问题的特殊结构,可以通过按单位成本分类简单地解决它。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号