...
首页> 外文期刊>International Journal of Energy Optimization and Engineering: An official publication of the Information Resources Management Association >Sectionalizing and Redundancy of the 0.38 kV Ring Electrical Network: Mathematical Modeling Schematic Solutions
【24h】

Sectionalizing and Redundancy of the 0.38 kV Ring Electrical Network: Mathematical Modeling Schematic Solutions

机译:0.38 kV环电网的分割和冗余:数学建模原理化解决方案

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The use of power line sectionalizing and power line redundancy in 0.38 kV networks entails the need to take into account the fact that currents and voltages can vary significantly at different points of the network. The article proposes a mathematical model to solve this problem. The mathematical model is based on the method of phase coordinates. Using mathematical modeling, the article determines the voltages and currents in the sections of the backup line after the automatic load transfer switch is activated. The article also proposes an improvement in the scheme of the power line sectionalizing unit. The sectionalizing unit scheme is suggested to be modified with a bypass circuit and the installation of a voltage indicator for signaling the voltage presence on the lower contacts of the switch.
机译:在0.38 kV网络中使用电力线切割和电力线冗余需要考虑到电流和电压在网络的不同点中可能会变化的事实。 文章提出了一个解决这个问题的数学模型。 数学模型基于相位坐标的方法。 使用数学建模,在激活自动负载转移开关后,可以确定备用线部分的电压和电流。 本文还提出了电力线划分单元的方案的改进。 建议用旁路电路和安装电压指示器来修改分割单元方案,用于向开关的下部触点上发出电压存在。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号