OPTIMISATION AND CONSTRAINT BASED HEURISTIC METHODS FOR ADVANCED PLANNING AND SCHEDULING SYSTEMS

机译:高级规划和调度系统的优化基于约束的启发式方法

获取原文
获取原文并翻译 | 示例

摘要

Manufacturing Resources Planning (MRPII) systems are unable to prevent capacity problems occurring on the shop floor because of the fixed lead time and backward scheduling logic. For this reason, a new breed of concepts called APS (Advanced Planning and Scheduling) systems emerged which include finite capacity planning at the shop floor level through constraint based planning. In this paper, we present a Constraint Programming (CP) model to show how optimization models could be used in this context. We also present a two phase heuristic to solve this complicated APS problem. While jobs are assigned to the best eligible machines to smooth the workload on the machines in the first phase, a constraint based scheduling heuristic schedules jobs once they are assigned to eligible machines in the second phase. We provide numerical tests and discuss the results for both the model and the heuristic. The concluding remarks and suggestions for future research are stated in the final section of the paper.
机译:由于固定的提前期和后向调度逻辑,制造资源规划(MRPII)系统无法防止在车间发生的容量问题。出于这个原因,出现了一种新的概念,包括基于约束的规划,包括在商店楼层的有限容量规划的APS(高级计划和调度)系统。在本文中,我们介绍了一个约束编程(CP)模型,以显示如何在此上下文中使用优化模型。我们还提出了两相启发式来解决这个复杂的AP问题。虽然作业被分配给最佳符合条件的机器,以便在第一阶段将工作量平滑工作,但一旦将其分配给第二阶段的合格计算机,就基于机器上的工作负载。我们提供数值测试,并讨论模型和启发式的结果。本文的最后一节规定了未来研究的结论性和建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号