首页> 外文期刊>International journal of ecohydrology and hydrobiology >Long term follow-up of pCO(2), pCH(4) and emissions from Eastmain 1 boreal reservoir, and the Rupert diversion bays, Canada
【24h】

Long term follow-up of pCO(2), pCH(4) and emissions from Eastmain 1 boreal reservoir, and the Rupert diversion bays, Canada

机译:PCO(2),PCH(4)和Eastmain 1 Boreal水库的排放的长期随访,以及加拿大的鲁珀特转移湾

获取原文
获取原文并翻译 | 示例
           

摘要

Eastmain 1 reservoir (James Bay area, Quebec, Canada) is a 600 km(2) boreal reservoir, created in November 2005 in the Eastmain River watershed. To increase the volume of water transiting in Eastmain 1 (EM 1), the Rupert River was diverted. Partial flooding of the Rupert diversion bays (RD) took place in 2009 and the flooding was completed in 2011. CO2 and CH4 partial pressures and emissions were monitored for 7 years on the reservoir and bays.
机译:Eastmain 1水库(詹姆斯湾区,加拿大魁北克湾)是一家600公里(2)河北方水库,于2005年11月在东部河流域创建。 为了增加Eastmain 1(EM 1)的水量转运量,鲁珀特河被转移。 鲁珀特转移湾(RD)的部分洪水于2009年举行,洪水于2011年完成。在水库和海湾监测二氧化碳和CH4部分压力和排放7年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号