首页> 外文期刊>International journal of applied mechanics >A Cost-Effectiveness Protocol for Flood-Mitigation Plans Based on Leeds' Boxing Day 2015 Floods
【24h】

A Cost-Effectiveness Protocol for Flood-Mitigation Plans Based on Leeds' Boxing Day 2015 Floods

机译:基于利兹拳击日的洪水缓解计划的成本效益议定书2015年洪水

获取原文
获取原文并翻译 | 示例
           

摘要

Inspired by the Boxing Day 2015 flood of the River Aire in Leeds, UK, and subsequent attempts to mitigate adverse consequences of flooding, the goals considered are: (i) to revisit the concept of flood-excess volume (FEV) as a complementary diagnostic for classifying flood events; (ii) to establish a new roadmap/protocol for assessing flood-mitigation schemes using FEV; and, (iii) to provide a clear, graphical cost-effectiveness analysis of flood mitigation, exemplified for a hypothetical scheme partially based on actual plans. We revisit the FEV concept and present it as a three-panel graph using thresholds and errors. By re-expressing FEV as a mml:semantics 2 mml:mspace width="3.33333pt"/mml:mspace m mml:semantics-deep square lake of equivalent capacity, one can visualise its dimensions in comparison with the river valley considered. Cost-effectiveness of flood-mitigation measures is expressed within the FEV square-lake; different scenarios of our hypothetical flood-mitigation scheme are then presented and assessed graphically, with each scenario involving a combination, near and further upstream of Leeds, of higher (than existing) flood-defence walls, enhanced flood-plain storage sites, giving-room-to-the-river bed-widening and natural flood management. Our cost-effectiveness analysis is intended as a protocol to compare and choose between flood-mitigation scenarios in a quantifiable and visual manner, thereby offering better prospects of being understood by a wide audience, including citizens and city-council planners. Using techniques of data analysis combined with general river hydraulics, common-sense and upper-bound estimation, we offer an accessible check of flood-mitigation plans.
机译:灵感来自于2015年利兹,英国的河流河流洪水洪水,随后试图减轻洪水的不利后果,所考虑的目标是:(i)重新审视洪水过量体积(FEV)的概念作为互补诊断用于分类洪水事件; (ii)建立新的路线图/议定书,用于使用FEV评估防洪计划; (iii)为洪水缓解提供明确的图形成本效益分析,示例为基于实际计划部分的假设方案。我们使用阈值和错误重新审视FEV概念并作为三面板图。通过将FEV重新表达为MML:语义2 MML:MSPACE宽度=“3.33333PT”/ MML:MSPace M MML:语义 - 深度方形湖的等效容量,可以与考虑的河流相比,可以可视化其尺寸。洪水缓解措施的成本效益在FEV广场湖中表达;然后将我们假设的防洪方案的不同情景以图形方式呈现和评估,每个场景涉及较高(现有)泛防墙,增强的洪水普通存储网站,靠近(现有)靠近和进一步上游的组合,接近和进一步。河流床加宽和自然洪水管理。我们的成本效益分析旨在以可量化和视觉方式进行比较和选择防洪场景之间的协议,从而提供了广泛的受众,包括公民和城市 - 议长策划者所理解的更好前景。利用数据分析技术与一般河流液压,常识和上限估计相结合,我们提供了洪水缓解计划的可访问检查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号