Review and Survey of 4D Simulation Applications in Forensic Investigation of Delay Claims in Construction Projects

机译:4D仿真应用中的延迟调查建设项目延迟索赔中的审查与调查

获取原文
获取原文并翻译 | 示例
       

摘要

Four-dimensional (4D) simulation is not frequently used in courtrooms because it is considered costly, complex, and risky. The experience in litigation systems reveals that many expert witnesses at present are not familiar with 4D simulation and are reserved about using technology. The objectives of this article are to discuss the efficiency and value of 4D simulation in construction claims as a tool for supporting legal arguments, stakeholder's viewpoints, and interrogatory considerations. In delay claims, conventional methods, tools, and 4D simulation concepts were used. The case study considered the appropriate level of development (LOD) for claims: summary for the full scope, and detailed for event specific information. This case study was presented to seven lawyers. A survey, extended with semistructured interviews, was sent to 17 additional external construction litigation lawyers. The results show the advantages and conditions of using 4D simulation for different contractual dispute resolution situations considered in construction claims for avoidance, resolution, and litigation. The 4D simulation is developed based on building information modeling (BIM) that can be binding or nonbinding. In the latter case, it can be developed to strengthen the position of one party's argument and visualize multiple scenarios (as-built, as-planned, claim events). Other results considering the rules of law show a list of influence factors with 4D simulation in delay claims, types of evidence, and limitations, such as suitable formats and courts for 4D simulations. (c) 2020 American Society of Civil Engineers.
机译:四维(4D)模拟在法庭上不经常使用,因为它被认为是昂贵的,复杂的和风险。诉讼系统的经验表明,目前的许多专家证人并不熟悉4D仿真,并保留了使用技术。本文的目标是讨论施工索赔中4D模拟的效率和价值作为支持法律论据,利益相关者观点和审讯考虑的工具。在延迟索赔中,使用常规方法,工具和4D仿真概念。案例研究审议了索赔的适当发展水平(LOD):全部范围的摘要,并详细介绍事件特定信息。本案例研究呈现给七个律师。延长了一项调查,延伸了半系统的访谈,被送到了17个额外的外部建设诉讼律师。结果表明,在施工索赔中考虑的不同合同纠纷解决情况使用4D模拟的优点和条件,以避免,解决和诉讼。基于建筑信息建模(BIM)开发的4D仿真,其可以具有绑定或非粘合。在后一种情况下,可以开发它以加强一个派对的论点的位置,并可视化多种场景(竣工,有计划的声明事件)。考虑到法律规则的其他结果显示了延迟索赔,证据类型和限制的4D模拟的影响因素列表,例如适用于4D模拟的合适格式和法院。 (c)2020年美国土木工程师协会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号