...
首页> 外文期刊>International Journal of Applied Engineering Research >Fuzzy AHP and Fuzzy VIKOR Approach modelling for flood control project selection
【24h】

Fuzzy AHP and Fuzzy VIKOR Approach modelling for flood control project selection

机译:洪水控制项目选择模糊AHP与模糊Vikor方法模型

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents a fuzzy multi criteria analysis approach for selecting of flood control project alternatives which takes economics, social and environment into account. The multi criteria nature and the presence of both qualitative and quantitative factors make it considerably more complex. In this study, a fuzzy multi criteria decision making (MCDM) model is proposed to project evaluation. This model solves flood control project problem in fuzzy environment where both criteria and weights could be in fuzzy sets. The Fuzzy Analytic Hierarchy Process (FAHP) method is used to determine the weights of the criteria. After that, fuzzy VlseKriterijumska Optimizacija I Kompromisno Resenje (fuzzy VIKOR) is proposed to rank the alternatives. The outcome of this research is ranking and selecting best alternatives with the help of fuzzy VIKOR. A case study in the Aie River basin of Chirang district, BTAD, Assam, India has been studied consisting of four alternatives to illustrate the proposed model.
机译:本文提出了一种模糊多标准,用于选择洪水控制项目替代方案,考虑到经济学,社会和环境。多标准性质和定性和定量因素的存在使得它更加复杂。在本研究中,提出了一种模糊多标准决策(MCDM)模型对项目评估。该模型在模糊环境中解决了洪水控制项目问题,其中标准和重量都可能是模糊集。模糊分析层次处理(FAHP)方法用于确定标准的权重。之后,建议模糊Vlsekriterijumska OptimizaCija i Kompromisno Resenje(模糊Vikor),以对替代品进行排名。这项研究的结果是在模糊Vikor的帮助下排名和选择最佳替代品。在印度的吉兰区艾河流域艾河流域案例研究由四种替代品组成,以说明所提出的模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号