...
首页> 外文期刊>International Aluminium Journal >“Everyone involved in the revamp did a splendid job”
【24h】

“Everyone involved in the revamp did a splendid job”

机译:“参与改造的每个人都有一个灿烂的工作”

获取原文
获取原文并翻译 | 示例
           

摘要

Beginning of 2016, as part of a comprehensive modernization project Riedhammer GmbH in Nuremberg, Germany, reconstructed the Anode Baking Furnace No. 3 at Aluminium Bahrain (Alba). The reconstruction took place between March and June, in only 100 days, which for an anode furnace with 68 sections was a very demanding task. In a talk with this journal Thomas Janousch, head of the Carbon business at Riedhammer, explains the jobs and challenges entailed in order to implement this turnkey project, which included engineering, delivery of materials, the execution of the construction work, the adaptation of the existing firing system and the supervision of construction including HSE management procedures.
机译:2016年初,作为德国纽伦堡纽伦堡综合现代化项目Riedhammer GmbH的一部分,在巴林(Alba)中重建了3号阳极烤炉3号。 该重建在3月和6月之间发生,仅在100天内,这对于68个部分的阳极炉是一个非常苛刻的任务。 在与这个杂志托马斯Janousch的谈话中,在Riedhammer的碳业主负责人下解释了职业和挑战,以便实施这个交钥匙项目,其中包括工程,材料的材料,施工工作的执行,适应 现有的射击系统和施工监督,包括HSE管理程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号