...
首页> 外文期刊>Industrial and organizational psychology >Challenges of Accessing Water for Agricultural Use in the Breede-Gouritz Catchment Management Agency, South Africa
【24h】

Challenges of Accessing Water for Agricultural Use in the Breede-Gouritz Catchment Management Agency, South Africa

机译:在南非生殖 - 古丽茨集水机构中农业用水进入水的挑战

获取原文
获取原文并翻译 | 示例
           

摘要

Agricultural water is not equitably shared in South Africa. A substantial proportion of water is in the hands of large commercial farmers and the water access of smallholder farmers is limited. Policies and strategies developed since 1994 to ensure equal access to productive water have had little impact. This paper presents an analysis of the challenges of accessing water through the water user licence process in the Breede-Gouritz Catchment Management Agency (BGCMA) of South Africa. A review of the national Water Allocation Reform (WAR) programme and the related BGCMA strategies was carried out. Interviews were conducted with smallholder farmers and with key officials responsible for water allocation processes in the BGCMA and other water-related institutions; the Framework of Water Governance by Franks and Cleaver (2007) was used to analyse the processes. Results revealed that existing lawful water use continues to privilege previously advantaged commercial farmers and that smallholder farmers' access to productive water is hampered by lack of human and financial capacity within the institutions that support them, and by limited coordination among these institutions. A water allocation unit at the BGCMA that specifically deals with water licencing is necessary to speed up the process and to enable local people to inclusively participate in water resource management.
机译:农业用水在南非不公平分享。大部分水掌握在大型商业农民的手中,小农农民的进入有限。自1994年以来制定的政策和策略,以确保对生产性水的平等获得影响较小。本文介绍了通过南非的Beye-Gouritz集水管理机构(BGCMA)中的水价牌照过程进入水的挑战。对国家水分配改革(战争)方案进行审查,并进行了相关的BGCMA战略。采访是与小农农民进行的,并负责BGCMA和其他与水有关的水分配过程的关键官员; FACKERS和CLEAVER(2007)的水治理框架用于分析过程。结果表明,现有的合法用水仍然有利于先前优缺的商业农民,并通过在支持它们的机构内缺乏人类和金融能力,以及这些机构之间的有限协调,缺乏人类和财务能力,以及在这些机构之间的有限协调中受到阻碍而受到影响。 BGCMA的水分配单位专门处理水许可,是加快过程,使当地人能够完全参与水资源管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号