...
首页> 外文期刊>Argus global LNG >ExxonMobil refuses png terms for Lng expansion
【24h】

ExxonMobil refuses png terms for Lng expansion

机译:埃克森美孚拒绝了液化天然气局势局限性的PNG术语

获取原文
获取原文并翻译 | 示例
           

摘要

The Papua New Guinea (PNG) government says it is disappointed with the prog- ress of its talks with partners in the 6.9mn t/yr PNG LNG venture over a third production train after operator ExxonMobil refused the terms proposed. PNG’s State Negotiating Team (SNT) has carried out extensive preparatory work to draft terms that are in line with international standards and that ensure a good deal for the people of PNG, energy minister Kerenga Kua says. “It is disap- pointing Exxon has refused to even consider these terms and we urge them to reconsider their position,” Kua says.
机译:巴布亚新几内亚(PNG)政府表示,在运营商ExxonMobil拒绝提议的术语后,在第三次生产火车上与第三次生产火车的伙伴会谈中对其谈判的谈判的谈判失败。 PNG的国家谈判团队(SNT)对国际标准的条款进行了广泛的筹备工作,并确保了PNG的人民,能源部长Kerenga Kua表示。 “它正在违背埃克森拒绝考虑这些条款,我们敦促他们重新考虑他们的立场,”Kua说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号