...
首页> 外文期刊>Asia Oil and Gas Newsletter >Aussie Dorado-2 progress
【24h】

Aussie Dorado-2 progress

机译:澳大利亚多拉多 - 2进展

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Santos has made progress at the Dorado-2 appraisal well off- shore Western Australia. The current drilling depth is around 2,250m (7,382ft). The Dorado-2 well is located in WA-437-P and was spudded in early May using the Noble Tom Prosser jack-up rig. Santos is the operator of WA-437-P with an 80% stake, Carnarvon Petroleum holds the remaining 20%. Carnarvon said that the 17.5-inch hole was drilled to a depth of around 1,230m (4,036ft) Measured Depth (MD) and the 13.375-inch casing has been set and cemented in place.
机译:桑托斯在Dorado-2评估中取得了进展,距离西澳大利亚州距离。 目前的钻孔深度约为2,250米(7,382英尺)。 Dorado-2井位于WA-437-P,早点可以使用贵族汤姆Prosser Jack-Up钻井平台。 桑托斯是WA-437-P的运营商,拥有80%的股权,卡内尔沃石油剩下的剩余20%。 Carnarvon表示,17.5英寸的孔钻到约1,230米(4,036英尺)的深度(MD),并且已经设定并巩固了13.375英寸的壳体。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号