...
首页> 外文期刊>Asia Oil and Gas Newsletter >Gorgon Stage 2 drilling starts
【24h】

Gorgon Stage 2 drilling starts

机译:GORGON第2阶段2钻探开始

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Chevron and its joint venture partners have started the Gorgon Stage 2 drilling campaign off northwest Western Australia. Gorgon Stage 2 is an expansion of the existing subsea gas gathering network on the Chevron-led Gorgon facility and was part of the project’s original development plan. The campaign will drill 11 additional wells on the Gorgon and Jansz-Io gas fields in order to maintain long-term natural gas supply to the 15.6m tonnes per annum LNG and domestic gas plants on Barrow Island. Chevron Australia’s Managing Director, Al Williams, said: “This development supports Chevron’s long-term supply of affordable, reliable and ever-cleaner energy to Western Australia and our regional neighbors. “This expansion will support local employment and contract opportunities on Gorgon for decades to come, with immediate benefits flowing through the drilling and completion activities, subsea infrastructure installation and local project management,” added Williams.
机译:雪佛龙及其合资合作伙伴已经开始了西北西北部的Gorgon第2阶段钻探运动。 GORGON第2阶段是在雪佛龙领导的GORGON设施上现有的海底气体集合网络的扩展,是项目原始发展计划的一部分。 该活动将在Gorgon和Jansz-IO气田上钻出11个额外的井,以维持长期天然气供应到每年的15.6米吨,并在Barrow岛上的家用煤气厂。 Chevron Australia的董事总经理Al Williams表示:“这一发展支持雪佛龙为西澳大利亚和我们的区域邻国提供了高效,可靠和更清晰的能源。 “这种扩张将支持戈登的当地就业和合同机会,几十年来,通过钻探和完工活动,海底基础设施安装和当地项目管理流动的直接福利,”威廉姆斯增加了“。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号