...
首页> 外文期刊>Asia Oil and Gas Newsletter >Triangle’s tricky Cliff Head issues
【24h】

Triangle’s tricky Cliff Head issues

机译:三角形的棘手的悬崖头问题

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Triangle Energy has experienced issues with operations on its Cliff Head oil field offshore Australia, which caused the production to halt from one of the wells. On 30 May 2018, a technical issue occurred during steady state production operations, which caused well CH12H to stop producing, Triangle said. Company personnel were immediately mobilised to the unmanned production platform and following diagnostic tests, confirmed the issue is associated with production well CH12H’s downhole Electric Submersible Pump (ESP).
机译:三角能源在澳大利亚悬崖上的悬崖头油田的行动中经历了问题,这导致生产从井中停止。 三角形表示,于2018年5月30日,在稳态生产运营期间发生了技术问题,这导致CH12H井停止生产。 公司人员立即动员到无人生产平台,遵循诊断测试后,确认该问题与生产井CH12H的井下电潜水泵(ESP)相关。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号