Santos has awarded Technip Oceania a contract to supply the Subsea Production System (SPS) for the Barossa field development project, strengthening the field’s position as the leading candidate for Darwin LNG (DLNG) back- fill.
展开▼
机译:Santos已获得Technip Oceria A合同,为Barossa Field Development项目提供海底生产系统(SPS),加强现场作为达尔文LNG(DLNG)后填充的领先候选人的地位。
展开▼