...
首页> 外文期刊>Argus Coal Daily: Weekly Price Bulletin >MISO coal plants shift away from must-run bids
【24h】

MISO coal plants shift away from must-run bids

机译:味噌煤炭植物远离必须运行的投标

获取原文
获取原文并翻译 | 示例
           

摘要

Coal-fired power plant operators in the Midcontinent Independent System Operator (MISO) cut their must-run commitments in the power grid’s day-ahead markets by 21pc this past winter to account for increased competition from low-cost natural gas generation. Generators in MISO offered 27,628MW of coal capacity, or 63pc of their overall available coal-fired generation, as mustrun in the day ahead markets during the past winter. That must-run capacity was down from 34,879MW, or 79pc of total coal-fired generation, in the previous winter, David Patton of independent market monitor Potomac Economics said 24 March during the power grid's quarterly meeting.
机译:中外地独立系统运营商(MISO)中的燃煤电厂运营商在过去的冬季将其必须在电网的日前市场中的必须运行的承诺削减了他们在电网前市场中的必要承诺,以便增加低成本天然气产生的竞争。 MISO中的发电机提供27,628MW的煤炭能力,或63分在过去的冬季前方市场的篡改。 在过去的冬天,必须从34,879MW或79分的燃煤发电量下降,独立市场监控Potomac经济学的David Patton在电网季度会议期间表示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号