首页> 外文期刊>Argus Biomass Markets >Arensis restarts Andover plant
【24h】

Arensis restarts Andover plant

机译:arensis重新启动和植物

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

California-based Arensis has restarted production and installed a combined heat and power (CHP) plant at its 55,000 t/yr Andover wood pellet production facility in Hampshire, England, it said. Arensis purchased the plant from UK-based wood pellet producer and distributor Verdo Renewables in October last year and restarted production in December. Production has been contracted, "but we are still finalising what will happen in the future", Arensis said. "The Andover plant is the only substantial producer of A1 wood pellets in England."
机译:它说,基于加利福尼亚州的Varensis已经在英国汉普郡的汉普郡55,000吨/年的55,000吨/年和木质颗粒生产设施中重新启动生产并安装了综合热量和电力(CHP)工厂。 Arensis于去年10月从英国木颗粒生产国和经销商Verdo可再生能源购买植物,并于12月重启生产。 生产已收缩,“但我们仍然最终确定将来会发生的事情”。 “安多弗厂是英格兰A1木质颗粒的唯一大量生产商。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号