首页> 外文期刊>Argus Biomass Markets >Drax rail hitch cuts biomass deliveries to units 2 and 3
【24h】

Drax rail hitch cuts biomass deliveries to units 2 and 3

机译:Drax Rail Hitch将生物量切割到单元2和3

获取原文
获取原文并翻译 | 示例
           

摘要

A fire has caused an unplanned outage at Drax’s rail unloading facilities and restricted wood pellet deliveries to its Selby power plant, leading the company to cut biomass burn at two units for more than three weeks. Drax’s 645MW biomass-fired units 2 and 3 at Selby power plant will be off line for 25 days from 22 December to 15 Januayr. The unplanned outage began on 15 December. Power generation has been reduced to “optimise supplies”, Drax said. Some wood pellet supplies are still being delivered by rail and truck.
机译:火灾导致司令部的铁路卸载设施和限制木质颗粒交付到其Selby Power Plation,导致公司在两个单位中将生物量燃烧超过三周。 Selby Power Plant的Drax的645MW生物质发射单位2和3将于12月22日至15日至15日至15日。 意外停电始于12月15日。 Drax表示,发电已减少为“优化耗材”。 一些木质颗粒用品仍然被铁路和卡车送出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号