...
首页> 外文期刊>Argus Biomass Markets >Uskmouth power plant begins biomass testing
【24h】

Uskmouth power plant begins biomass testing

机译:uskmouth发电厂开始生物量测试

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

UK-based power producer Simec Atlantis Energy (Simec) has begun testing biomass at its 220MW Uskmouth coal-to- biomass conversion power plant in Newport, south Wales. “A stable fame has been achieved in medium scale testing, proving the stable combustion of 100pc waste derived fuel pellets,” Simec said. The plant remains on track to be commercially operational by 2021, it added. The converted power station will have an operational life of 20 years.
机译:基于英国的电力生产商SIMEC Atlantis Energy(Simec)已经开始在南威尔士州纽波特的220mW澳元煤炭到生物量转换发电厂进行测试生物量。 “在中规模测试中实现了稳定的名称,证明了100PC废物衍生燃料颗粒的稳定燃烧,”SIMEC说。 它补充说,该工厂仍然在商业上进行商业运营。 转换电站的运行寿命为20年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号