...
首页> 外文期刊>Arabian journal of geosciences >Application of numerical back analysis for determination of soil mass specifications during tunnel construction
【24h】

Application of numerical back analysis for determination of soil mass specifications during tunnel construction

机译:数值反分析在隧道施工期间测定土壤质量规格的应用

获取原文
获取原文并翻译 | 示例

摘要

Geotechnical parameters play key roles in constructing and developing civil engineering projects, especially underground structures. One of the conventional methods to evaluate the tunnels' behavior and safety is applying a back-analysis method to assess the displacement amount during the construction of different parts of the tunnel. Applying this method and using displacement values obtained by tunnel monitoring, the estimated values of geotechnical parameters may converge to their real values. The present study was conducted to improve the estimation accuracy of geotechnical parameters for the tunnel route of Karaj (located 36 km west of Tehran, Iran) subway using the alternative univariate back analysis in FLAC3D software and modifying tunnel maintenance requirements, accordingly. The results showed that the use of geotechnical parameters extracted using back analysis lead to a more accurate design of the tunnel. Overall, through the applied back analysis, it is possible to reduce the shotcrete thickness of some subway stations up to 43% and obtain an optimum design.
机译:岩土地参数在构建和开发土木工程项目,尤其是地下结构方面发挥关键作用。评估隧道行为和安全性的传统方法之一是应用背分析方法,以评估隧道不同部位的施工过程中的位移量。应用该方法并使用隧道监测获得的位移值,岩土地参数的估计值可以收敛到它们的实值。目前的研究是通过FLAC3D软件中的替代单变量的背部分析提高卡拉夫隧道路线(位于德黑兰,伊朗以西36公里)的岩土地参数估计准确性,并使用FLAC3D软件和修改隧道维护要求。结果表明,利用后分析提取的岩土参数导致隧道更加精确地设计。总的来说,通过施加的后退分析,可以减少一些地铁站的喷射率厚度,高达43%并获得最佳设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号