...
首页> 外文期刊>Arabian journal of geosciences >Optimized operation of diversion-type hydropower reservoir to alleviate ecological degradation of the de-watered river reach
【24h】

Optimized operation of diversion-type hydropower reservoir to alleviate ecological degradation of the de-watered river reach

机译:转移型水电站的优化运行,以减轻脱水河达到的生态降解

获取原文
获取原文并翻译 | 示例
           

摘要

Diversion-type hydropower stations usually cause seriously de-watered situation of the natural river reach, which has adverse effects on the downstream river ecosystem. To alleviate the negative impacts on ecosystem of natural river reach, this study quantified the ecological requirements and incorporated them into the reservoir operating schemes to provide the ecological flow, which is beneficial to the balance between ecosystem protection and hydropower generation. The method mainly includes (1) propose an optimal ecological flow calculation method based on runoff probability distribution, (2) combine minimum ecological flow with optimal ecological flow to define the ecological protection degree, and then (3) establish the multi-objective optimization model of reservoir with the goal of maximizing ecological protection degree and power generation (DPM) and solve it with NSGA-II. In the meanwhile, the optimization model with the goal of minimizing ecological water shortage and maximizing power generation (SPM) was established and solved which was regarded as a control batch. A case study performed with the Liujiaping (LJP) reservoir in Hunan Province of South China demonstrates that optimized operation can play a protective role in the ecology of the dewatered section. And DPM has better ecological benefits than SPM under the same power generation benefits, especially when the emphasis is placed on ecological benefits.
机译:转移式水电站通常导致自然河到达的严重脱水情况,这对下游河流生态系统具有不利影响。为了缓解天然河达达的生态系统的负面影响,本研究量化了生态要求,并将其纳入了水库运营计划,以提供生态流动,这有利于生态系统保护与水电站之间的平衡。该方法主要包括(1)提出了一种基于径流概率分布的最佳生态流量计算方法,(2)将最小生态流量与最佳生态流量相结合,以定义生态保护程度,然后(3)建立多目标优化模型储层的目标最大化生态保护程度和发电(DPM)并用NSGA-II解决。同时,建立并解决了具有最小化生态水短缺和最大化发电(SPM)的目标的优化模型,被认为是对照批次。湖南省刘家平(LJP)水库进行了一个案例研究表明,优化的运作可以在脱水部分的生态中发挥保护作用。 DPM在相同的发电效益下具有比SPM更好的生态效益,特别是当重点放在生态益处时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号