首页> 外文期刊>Annals of the American Thoracic Society >Evaluation of a traditional method for peak flow discharge estimation for floods in the Wenchuan Earthquake area, Sichuan Province, China
【24h】

Evaluation of a traditional method for peak flow discharge estimation for floods in the Wenchuan Earthquake area, Sichuan Province, China

机译:中国四川汶川地震区洪水峰流量排放估计传统方法评价

获取原文
获取原文并翻译 | 示例
           

摘要

Peak discharge of flood in small mountainous watershed is usually calculated using the Rainstorm-runoff calculation method in small watersheds in Sichuan Province (RRM). This study evaluated the RRM calculation using real-time monitored rainfall and hydrologic data from a small watershed in the Wenchuan Earthquake area of Sichuan Province, China. The results indicated that the discharge values given by the RRM are commonly overestimating the measured discharge. The overestimation rate was discussed and empirical equations were proposed for improving RRM estimations, based on the relationship between calculated and measured discharge values at different watershed scales (2, 30, and 40 km(2)), under different rainfall probabilities (0.97-0.5, 0.5-0.2, and 0.2-0.002), and for different rainfall durations (0-6, 6-24, and >24 h). The results of this study help contribute to the understanding of water floods formation and help provide more accurate estimations of peak flow discharge in small watersheds in the Wenchuan Earthquake area.
机译:在四川省小流域(RRM)中,通常计算小山地流域洪水的峰值排放。本研究评估了来自中国四川省四川汶川地震区的实时监测降雨和水文数据的实时监测降雨和水文资料。结果表明,RRM给出的放电值通常估计测量的放电。讨论过高估率,并且提出了基于不同流域鳞片(2,30和40 km(2))的计算和测量的放电值之间的关系来改善RRM估计的经验方程式(2,30和40 km(2))(0.97-0.5 ,0.5-0.2和0.2-0.002),以及不同的降雨持续时间(0-6,6-24和> 24小时)。本研究的结果有助于了解水洪水的理解,并帮助提供汶川地震区小流域中的峰流量排放的更准确估算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号