首页> 外文期刊>Africa oil and gas: Breaking news and analysis from Africa >Woodside sticking to SNE date with work in for next phases
【24h】

Woodside sticking to SNE date with work in for next phases

机译:Woodside粘在一起与下一阶段的工作

获取原文
获取原文并翻译 | 示例
       

摘要

Woodside confirmed it still expects to make a final investment decision on the US $3 Bn SNE project off Senegal before the end of the year and is concluding seismic for future phases. Phase 1 of the development will target an estimated 230m bbl of oil from 11 producing wells, 10 water injectors and two gas injectors. Diamond Offshore is providing the drill-ships with the Subsea Integration Alliance of Subsea 7 and Schlumberger's OneSubsea taking the subsea and Modec the FPSO.
机译:Woodside确认它仍然希望在年底之前对塞内加尔的3美元SNE项目进行最终投资决定,并在未来阶段结束地震。 该开发的第1阶段将靶向11个产生井,10个水喷射器和两个气体喷射器的230米BBL的油。 钻石离岸正在为钻头提供海底7和Schlumberger的Onesubsea的海底集成联盟,以海底和制定FPSO。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号