...
首页> 外文期刊>Africa oil and gas: Breaking news and analysis from Africa >Two steps forward and one back for VAALCO Gabon
【24h】

Two steps forward and one back for VAALCO Gabon

机译:前进的两个步骤和vaalco gabon的一步

获取原文
获取原文并翻译 | 示例
           

摘要

VAALCO has been hit by new problems with production at its Etame block off Gabon. The company's first electrical submersible pump (ESP) problems began back in 2011 on the Avouma field. Since then another pump failed on a well on Avouma and also at South Tchibala. VAALCO had taken the precaution of a secondary ESP at Avouma as a back-up, but this too failed only 10 days after it was started up.
机译:Vaalco因eTame街区的新问题而受到新的问题。 该公司的第一个电气潜水泵(ESP)问题在2011年开始于Avouma领域。 从那时起,另一个泵在Avouma井上失败,也在南·施塔尔。 Vaalco在Avouma作为备份时,vaalco预防二次ESP,但这在启动后的10天才失败。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号