...
【24h】

Keppel wins Yinson Nigeria FPSO fast-track

机译:Keppel赢得尼辛尼日利亚FPSO快速轨道

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Yinson has awarded Keppel Shipyard the contract for the fast-track modification of the FPSO destined for First E&P's Any-ala Madu fields off Nigeria.The work includes modification and upgrading of the FPSO Allan.Keppel Shipyard's scope includes refurbishment and life extension works,fabrication and installation of a new riser balcony,spread mooring system and helideck,as well as modification of the vessel's topsides and marine systems.Work will start this quarter with delivery in the first quarter of next year.Upon completion,the FPSO will have a storage ca-pacity of 700,000 bbl of oil and a processing capacity of 60,000 b/d.This is the third project Keppel has completed for Yinson with the last being destined for Eni's OCTP project off Ghana.
机译:YINSON已授予KEPPEL SHIPYARD THE THE KEPPEL SHIPARD的合同,用于尼日利亚的FPPSO的FPSO的快速修改。该工作包括修改和升级FPSO ALLAN.KEPPEL造船厂的范围包括翻新和生命延伸工作,制造 和安装新的立管阳台,涂抹系泊系统和Helideck,以及船只的Topsides和Marine Systems的修改。工程将于明年第一季度的送货。完成,FPSO将有一个存储 700,000 BBL的CA-PARITY为700,000 BBL和60,000 B / D的加工能力。这是第三个项目KEPPEL已为云森完成,最后为eni的octi octi off加纳注定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号