首页> 外文期刊>Africa oil and gas: Breaking news and analysis from Africa >Aker submits phased Ghana plan but second FPSO uncertain
【24h】

Aker submits phased Ghana plan but second FPSO uncertain

机译:AKER提交阶段加纳计划,但第二次FPSO不确定

获取原文
获取原文并翻译 | 示例
       

摘要

Aker has submitted a development plan to the Ghanaian authorities for its Pecan project while closing on the FPSO winner and deciding whether to use an option for a second vessel. Aker has finalised a phased development scenario for the multiple fields on the Deepwater Tano/ Cape Three Points block. This will start with the development of the current reserves at the Pecan field itself where appraisal drilling is still ongoing and for which commercial tenders for the leased FPSO from four contractors were opened in February.
机译:AKER已向加纳当局提交了一个发展计划,为其PECAN项目结束,同时关闭FPSO获奖者并决定是否使用第二艘船的选择。 AKER最终确定了Dewwater Tano / Cape三个点块上的多个字段的分阶段开发方案。 这将从山核桃领域的现行储备的开发开始,评估钻探仍然正在进行,并于2月份开放了四名承包商的租赁FPSO的商业投标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号