As the Crown Sydney construction project topped out, the Men from Marr's (Marr Contracting) had to dismantle their bespoke M390D crane, which was working on site for the past 27 months. The Crown Sydney will include 349 hotel rooms and suites; luxury residential apartments; 14 restaurants and bars; retail outlets and more. Due to its location - in a congested CBD waterfront space between the Harbour to the west and another construction site to the east - and the complex sculptural design, which required a lot of heavy lifting to build the structural elements for the low-rise gaming floor and 75-storey high-rise, the project needed a unique craneage solution.
机译:随着皇冠悉尼建设项目的最大值,来自Marr's(Marr Contabled)的人必须拆除他们的定制M390D起重机,该起重机在过去27个月内正在现场工作。 悉尼皇冠包括349间酒店客房和套房; 豪华住宅公寓; 14间餐厅和酒吧; 零售店和更多。 由于其位置 - 在港口到西部和另一个建筑工地之间的拥挤的CBD海滨空间,以及复杂的雕塑设计,需要大量的沉重举起,为低层赌博地板构建结构元素 75层高的高层,该项目需要独特的裂绞线解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号