首页> 外文期刊>Cryogenics >Theoretical solution for the cool-down or warm-up process of a pipeline or a packed bed
【24h】

Theoretical solution for the cool-down or warm-up process of a pipeline or a packed bed

机译:管道或填充床冷却或预热过程的理论解决方案

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

For planning the start-up procedure of a pipeline under realistic conditions the cool-down or warm-up behaviour should be known in advance. The relation between the cool-down or warm-up time and the mass-flow rate in the pipeline should be known in particular. Based on heat balances theoretical relations had been derived to enable appropriate estimations. These derived theoretical relations are also valid for the cool-down or warm-up of packed beds used as heat accumulators, e.g., in regenerators. A simple experimental method is suggested to determine the heat transfer coefficient in a packed bed using the theoretical relation for the gas temperature as a function of time and length. As all variables in the formulae are dimensionless, normalized diagrams have been developed, which are valid for all the cases discussed.
机译:为了在实际条件下规划管道的启动过程,应事先了解冷却或预热行为。冷却或预热时间与管道中的质量流量之间的关系应特别了解。基于热平衡,已经得出理论关系以进行适当的估计。这些导出的理论关系对于例如蓄热器中用作蓄热器的填充床的冷却或预热也是有效的。建议使用一种简单的实验方法,根据气体温度与时间和长度的函数关系,确定填充床中的传热系数。由于公式中的所有变量都是无量纲的,因此已开发出规范化的图表,该图表对于所有讨论的情况均有效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号