首页> 外文期刊>AACE International Transactions >Skills and Knowledge of Cost Engineering: Scheduling
【24h】

Skills and Knowledge of Cost Engineering: Scheduling

机译:成本工程的技能和知识:调度

获取原文
获取原文并翻译 | 示例
       

摘要

The following chapter is an introduction into the skills and knowledge of scheduling. Scheduling includes the concept of updating, logic, and date processing, in accordance with the project execution plan that is a deliverable from the planning process (See Chapter 12, Project Planning.) Scheduling provides a way of contributing input during project execution concerning means, methods, techniques, sequences, or other conditions affecting outcomes. It uses the baseline established in planning and aligns the update of the schedule as a methodology of updating and analysis to allow for periodic progress and forecast reporting. Additionally, it establishes a basis for change management and project execution control to achieve successful outcomes.
机译:以下章节是调度技能和知识的介绍。 调度包括更新,逻辑和日期处理的概念,根据项目执行计划,该计划执行计划从规划过程中可传递(参见第12章,项目规划。)调度提供了在项目执行期间有关手段的贡献输入的方式, 影响结果的方法,技术,序列或其他条件。 它使用规划的基线并将计划的更新作为更新和分析的方法,以允许定期进度和预测报告。 此外,它还为改变管理和项目执行控制建立了基础,以实现成功的成果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号